Customization: | Available |
---|---|
Certification: | CE, ISO, SGS |
Installation Method: |
Horizontal |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
TECHNICAL PARAMETERS
1. Gas treatment capacity: m3/h, can be designed according to actual requirements from customers.
2. Normal flue gas temperature: 120-180ºC
3. Allowed max gas temperature: 250ºC
4. Allowed dust rate resistance: 104 -1011Ω/cm
5. Flue gas dew point: 60~65ºC
6. Dust concentration at flue gas inlet : <20(g/m3)
7. Dust concentration at flue gas outlet: <50 (mg/m3) , or to be designed according to requirements.
8. Controls: automatic control
STANDARD SPECIFICATIONS (EXAMPLE)
NO. | ITEMS | VALUE | REMARKS |
1 | effective cross sectional area(m2) | 28 | |
2 | Flue gas capacity(m3/h) | 36000 | |
3 | Gas velocity through ESP(m/s) | 0.36 | |
4 | Spacing between collecting plate(mm) | 400 | |
5 | Length of electric field(m) | 2*3 | |
6 | Number of passages | 10 | |
7 | Type of corona wire | BS wire | |
8 | Rows of corona wire | 10 | |
10 | Rapping method of corona wires | Flexible arm | |
11 | Rapping method of collecting plate | Flexible arm | |
12 | Type of collecting plate | C480 | |
13 | Rows of collecting plate | 11 | |
14 | Total area of collecting plate(m2) | 840 | |
15 | Effective height of collecting plate(m) | 7 | |
16 | Treatment time(s) | 16.7 | |
17 | Allowed pressure (Pa) | +200~-5000 | |
18 | Pressure drop(Pa) | <300 | |
19 | Allowed max flue gas temperature (ºC) | 250 | |
20 | Dust concentration at flue gas inlet (g/m3) | <20 | |
21 | Dust concentration at flue gas outlet (mg/m3) | <50 | |
22 | Designed dust collecting efficiency | 99.5% | |
23 | High-voltage constant current power supply | 0.2A/100KV×2 sets |